Technology Plan Wiki

Technology Plan

Section 8: Technology Type and Costs, and Coordination with Funding Resources

GOALS

ACTIVITIES

HARDWARE

SOFTWARE

COST

FUNDING SOURCE

TIMELINE

A. Integration

Develop advanced level of integration model for teacher technology competency.

No additional equipment needed

In Kind

Local

Yr. 1,2,3


Provide computer and/or peripheral equipment to support staff integration of technology into classes. (SL-Where do we outline minimum technology requirements, i.e. staff computers maximum of 3 years old, minimum of Windows XP, etc?)

Hardware; computers, SMART boards, LCD projectors, video devices, laptops, and other equipment.

$100K – 105K

Local Funds E-rate Title funds Grants

Yr. 1, 2, 3


Encourage the integration of ATM use into classes by offering or receiving an increase of 10 % broadcast activities.

On Site

In Kind

Local

Year 1


Provide teachers with in classroom technology support for integrating technology into specific curricular areas.

No additional equipment required.

In Kind

Local

Yr. 1,2,3

B. Professional Development

Provide staff development to raise staff to the level of computer literacy necessary to integrate technology into instruction.

Existing Equipment

MS Office,Moodle, Edline, Web

Instruction cost

Local staff development

Yr. 1, 2, 3


Encourage and support staff attendance at technology seminars, workshops, and conferences outside the District.

No additional equipment or software

1500-2000

Local Funds Title II

Yr 1, 2, 3


Provide technology training for staff on the use of specific software and hardware.

No additional equipment or software

10-12 K

Local Funds Title IV

Year 1

C. Access

Write grants to acquire computer equipment and software.

No additional equipment or software


Local Funds

Yr. 1, 2, 3


VOIP Provide staff the ability to easly communicate with teachers in other buildings of our district.

VOIP Phone systems in Albion, Benton, Clinton, LHS/LJHS


E-rate Local Funds

Yr. 1


Promote usage of a WAN for connecting all District schools

Internal WAN

None

E-rate Local Funds

Yr. 1, 2, 3

D. Student Achievement

Establish a plan for the assessment of students on standards outlined in the Maine Learning Results

No additional – Staff activity

1.5 K

Local Funds

Year 1,2,3

E. Support Services

Maintain existing networking infrastructure wire maintenance

Network wiring and approved networking equipment

60K

E-Rate Local Funds

Year 1, 2, 3







F. Communication

Disseminate and explain the MSAD #49 Technology Plan to faculty, staff, parents, community, and students.

No additional equipment or software

500-1K

Local Funds

Year 1


Continue to provide telephone, Internet and wireless services to staff and students

Additional wireless equipment

5K

Local Funds E-rate

Year 1, 2, 3


Provide and promote software to encourage parent, teacher and student collaboration using the Internet. (SL-Why isn't there more participation in Homework Hero?)

Ed-line programs

Case E

10-15 K

4.5 K

E-rate Local Funds Title 6 Reap

Year 1, 2


Rebuild website to provide better commuication and information to community.

Linux/Fedora

Free

Local Funds

Year 1, 2

G. Safety

Provide additional security cameras through out district?

Provide student photo IDs with barcodes for campus-wide use (SL-should this also include staff & visitor badges?)

Video server and cameras.

ID Badge Production equipment and software

6-7 K

Local Funds

Year 2 , 3


Centralize data management in a data repository allowing controlled access by authorized persons

No additional equipment needed. Current equipment maintenance

1-2 K

Local Funds

Yr. 1, 2 3